On this page
What does replacing a ducted aircon cost?
It depends on which of three options fits: like for like, a switch to wall-mounted units, or a partial change. Each is quoted after a site survey, because the ceiling, ducts and piping set the price.
The table sets out what each option involves, with Snowflake Aircon Services' survey fee from its rate card.
Scroll to see more columns
| Option | Market range in Singapore | Our rate | What it involves |
|---|---|---|---|
| Like for like: new ducted unit on the existing ducts | Only two operators publish a ducted supply-and-install price, on different scopes; unit size, ceiling access and duct condition set it. | Quoted per job | Unit lowered and replaced through the ceiling opening; ducts and grilles reused if sound |
| Switch to wall-mounted units | No published conversion price was found; the number of rooms and the ceiling repair set it. | Ducted unit removed, ceiling made good, wall units and new piping routes added | |
| Partial: replace the outdoor unit or one indoor unit | No published price was found; compatibility with the parts that stay sets it. | Only when the remaining parts are compatible and in good order | |
| Site survey before any quote | $30 / visit | Ceiling access, ducts, piping and power checked |
Ducted replacement is quoted after a site survey of the ceiling, ducts and piping. The survey fee is waived if you go ahead.
What moves a ducted quote
Four things set most of the price, and a site survey checks each one.
- The size of the ceiling opening: a small one may have to be enlarged to lower the unit.
- The ducts: sound ducts and grilles can be reused; crushed or damp ones cannot.
- The piping: reused only if it passes the same checks as any reused run.
- The ceiling finish: repairs after the work are part of the price.
Like for like, or switch to wall units?
Stay ducted when the ceiling already has a usable opening and the ducts are sound. The rooms keep their clean ceilings and the new unit goes in the old one's place.
Switch to wall units when the ducts are failing, the opening cannot take a new unit, or you want each room controlled on its own. Expect ceiling repair where the old unit and ducts come out.
Why a survey comes first
A ducted unit's access, ducts and piping are hidden until the ceiling is opened. A quote given without seeing them can only guess, and changes once the work starts.
Ask for the survey findings in writing: the opening size, the duct condition and whether the piping can stay.