On this page
Quick summary
A dated pre-tenancy aircon baseline report records vent temperatures, clean coils, drain drainage, louver motion, and remote serials before keys are handed over. Spending S$30 on a technician check prevents contested 30-day warranty claims and lease-end wear-and-tear disputes.
Six Checkpoints for Your Pre-Tenancy Baseline Sheet
Visual glances at closed indoor casings miss clogged blower wheels and sluggish compressors hidden inside the unit. Recording objective numbers and clear photographs gives both landlord and incoming occupant an agreed starting line for the tenancy.
Run every bedroom and living room unit simultaneously at 22 degrees Celsius on high fan for fifteen minutes while logging these six items.
Scroll to see more columns
| Inspection item | Target baseline reading | Evidence to capture | Warning sign to fix first |
|---|---|---|---|
| Supply air temperature | 10 to 14 degrees Celsius at vent | Digital thermometer photo per indoor blower | Air above 17 degrees Celsius after 15 minutes |
| Evaporator fins and blower | Clean silver fins, dust-free drum | Close-up flash photo with front cover lifted | Dark mould streaks or matted lint layer |
| Condensate drain flow | Steady drainage with zero tray pooling | Dry wall and trunking photo under unit | Slow trickle, gurgling noise, or damp plaster |
| Louvers and remote handsets | Smooth swing motor, working display | Short video clip and remote photo with batteries | Cracked flap clips or faded LCD screen |
| Outdoor condenser and ledge | Unobstructed airflow, rust-free brackets | Service yard or HDB ledge overview photo | Corroded mounting bolts or loud rattling |
Why Simultaneous Multi-Split Load Testing Matters
Most Singapore HDB flats and private condominiums rely on System 3 or System 4 multi-split condensers sharing one outdoor compressor. Testing bedrooms one by one hides low refrigerant charge or weak inverter capacity that surfaces only when all rooms run at night.
Switching every indoor unit on together exposes slow pull-down times, blinking error lights, or tripping circuit breakers before the incoming family unpacks.
Measure the temperature difference between room intake air above the unit and chilled supply air leaving the louver. A healthy split system drops temperature by 8 to 12 degrees Celsius steadily across every room, whereas uneven drops point to a restricted expansion valve or partial gas loss.
Outdoor Bracket and MCST Safety Verification
Building and Construction Authority safety standards require outdoor condenser brackets on HDB ledges and condo balconies to remain corrosion-free and tightly anchored. Checking stainless steel bolts and insulation lagging between tenancies prevents sudden MCST rectification notices mid-lease.
Inspect exposed copper pipe foam wrapping on the balcony or service yard as well. Sun-cracked insulation drips condensation onto downstairs neighbours and triggers swift management complaints.
Verify that the condensate discharge hose terminates cleanly into the designated floor trap rather than dangling loosely over the ledge. A two-minute check prevents water-dripping warnings from Town Councils or neighbouring units below.
How to Schedule and Share Your Baseline Pack
Complete the baseline check three to five days before the lease commencement date so minor repairs finish ahead of moving trucks. Follow this quick rollout checklist:
- Arrange a S$30 on-site diagnostic check or routine multi-unit clean (S$50 single, S$30 twin, or S$25 per blower on larger flats).
- Ask the technician to send clear photos of each opened coil, thermometer reading, and outdoor bracket straight to WhatsApp.
- Combine the photos and invoice into one PDF emailed to the tenant and property agent before key collection.
- Collect a quick email acknowledgement confirming every unit cooled properly on handover day.