Quick summary
Singapore's Energy Efficiency Grant co-funds up to 70% of qualifying aircon hardware for SMEs (30% for non-SMEs), but strictly excludes installation labour, copper piping, old-unit disposal, servicing, and 9% GST. Realistic cashflow planning prevents surprise post-installation out-of-pocket gaps.
Side-by-Side Split of Funded Versus Excluded Line Items
Many business owners mistakenly expect 70% off the entire aircon contractor invoice, only to discover during claim review that Enterprise Singapore strips out every non-equipment charge. Separating hardware cleanly from site works protects both your approval speed and your working capital.
Because EEG operates on a reimbursement basis, companies settle the full contractor invoice first and receive grant disbursement after submitting proof of payment, delivery orders, and installed equipment photos.
Scroll to see more columns
| Quotation line item | EEG funding status | Who pays initially | Practical Singapore budget note |
|---|---|---|---|
| Pre-approved condenser and fan coils | Covered (up to 70% SME / 30% non-SME) | Business pays first, reimbursed later | Must match exact GoBusiness model codes |
| Installation labour and commissioning | Excluded (0% grant support) | 100% business-funded | Higher for ceiling cassettes and night slots |
| Copper piping, insulation, and trunking | Excluded (0% grant support) | 100% business-funded | Long shophouse runs add material cost |
| Old unit dismantling and disposal | Excluded (0% grant support) | 100% business-funded | Includes haulage and refrigerant recovery |
| 9% Singapore GST across invoice | Excluded (0% grant support) | 100% business-funded | GST-registered firms claim input tax separately |
| Routine post-install servicing plan | Excluded (0% grant support) | 100% business-funded | Budget quarterly care to sustain 5-tick savings |
Worked Singapore SME Cashflow Maths on a Commercial Quote
Consider a typical Singapore clinic or office replacing aging units with S$10,000 worth of pre-approved 5-tick equipment hardware plus S$3,500 in installation labour, SWG-22 copper piping, condensate drains, and old-unit disposal. Total pre-tax contract value reaches S$13,500, or S$14,715 including 9% GST.
Under 70% SME co-funding, the grant calculates strictly against the S$10,000 qualifying hardware line, returning up to S$7,000 after claim verification. Your net project cost becomes S$6,500 before GST (around 48% of the total pre-tax job), plus any non-recoverable GST if your company is not GST-registered.
Why Lump-Sum Contractor Quotes Trigger Grant Queries
Contractors unfamiliar with Singapore government grants frequently issue one bundled line stating supply and install without separating equipment pricing from site labour. Grant officers cannot isolate qualifying hardware from lump-sum totals and will return the file for revision.
Artificially inflating equipment prices while marking labour down to S$0 also raises immediate audit flags against market benchmarks. Honest, transparent market rates on both hardware and installation protect disbursement.
Checklist to Verify Your Net Cost Before Accepting a Quote
Checking your upfront cashflow and true effective discount ahead of portal filing stops awkward funding shortfalls during installation week. Confirm these four financial details before signing anything:
- Calculate whether your firm can fund 100% of the contractor invoice temporarily until post-installation EEG reimbursement arrives.
- Verify whether your company is GST-registered so you know if the 9% tax is recoverable via IRAS or a direct expense.
- Check every site-specific extra upfront, including stainless steel brackets, condensate pumps, scaffolding, and after-hours mall charges.
- Have Snowflake measure your site (S$30 assessment, offset when installed) to receive an itemised equipment-and-labour quote needing zero deposit beforehand.