Why does the whole system stop?
A System 2, 3 or 4 runs every indoor unit from one outdoor unit and one refrigerant charge. A leak in any room's pipe drains the gas the other rooms share.
Testing has the same effect. To find the leak, the gas is usually recovered or pumped down and the pipes are filled with dry nitrogen, so the rooms cannot cool until the circuit is recharged.
| Stage | Which rooms are off | What sets the time |
|---|---|---|
| Gas recovered from the system | All rooms | The size of the charge |
| Nitrogen pressure test | All rooms | How long the pressure is held |
| Leak repaired | All rooms | Where the leak is and whether a part must be ordered |
| Vacuum and recharge by weight | All rooms | The charge for the whole system |
| Back in service | None | A final check in every room |
How long the system is off
How long the nitrogen is held sets the test time, and the repair adds to it. Ask the technician for the hold time before the work starts.
A joint remade on the visit adds little. A coil or a pipe section that has to be ordered keeps every room off until it arrives.
Can the other rooms keep running?
Usually not. The gas is recovered and the pipes are tested as one system, so every room typically waits for the same recharge.
Switching off the leaking room alone does not help either. The gas still escapes, and the outdoor unit runs short of charge for every room.
Planning the days without aircon
A test that holds overnight needs the flat left as it is. Do not switch the aircon on while the circuit holds nitrogen.
- Book the test for days the flat is least used, such as a work week.
- Ask whether the leak test and the repair can be done in one booking.
- Ask how long the nitrogen will be held, and why.
- Keep fans ready for the bedrooms.
- Ask for the test readings in writing before the system is recharged.
When a repeat leak points to replacement
A multi-split that needs repeated leak repairs costs every room its cooling each time. On an older system, compare the repair with a new system for the same rooms before the next test.