On this page
Quick summary
An EEG-compliant Singapore aircon quotation must list exact GoBusiness pre-approved model codes, separate qualifying hardware pricing from installation labour and 9% GST, and require S$0 deposit prior to portal filing. Starting with an on-site survey stops costly change orders mid-installation.
Line Items Every EEG Aircon Quotation Must Display
Uploading a vague WhatsApp screenshot or bundled supply-and-install estimate onto the Business Grants Portal guarantees review clarifications that push your approval back by weeks. Grant officers check specific commercial and technical identifiers line by line.
Comparing your contractor's draft against the checklist below before clicking submit keeps assessment swift and ensures your final tax invoice matches the approved offer down to the dollar.
Scroll to see more columns
| Required quotation element | What officers verify | Common drafting mistake | Clean compliant format |
|---|---|---|---|
| Applicant details and site address | Matches ACRA UEN and commercial lease | Addressed to director's personal name | Full company legal name, UEN, shop address |
| Exact outdoor and indoor codes | Verbatim match to GoBusiness repository | Generic 'Daikin System 4 5-tick' | Exact codes e.g. MKM85VVMG + fan coils |
| Separate hardware subtotal | Isolates eligible 70% SME grant base | Lumped together with copper piping | Standalone equipment subtotal per set |
| Separate labour and materials | Excludes non-qualifying site works | Hidden inside inflated unit price | Distinct lines for piping, brackets, disposal |
| 9% GST and zero-deposit clause | Confirms GST excluded and no early payment | Terms demanding 30% deposit upfront | Separate GST line; S$0 deposit before BGP |
What Technicians Measure During a S$30 Site Survey
Quoting commercial aircons purely off floorplan square footage misses ceiling obstructions, west-facing glass glare, kitchen ovens, and ageing electrical isolators. During an on-site walkthrough, technicians measure exact copper pipe lengths, inspect existing trunking routes, test drainage slope, and verify single-phase versus three-phase breaker capacity.
Spotting condensate pump needs, stainless steel bracket anchors, or ceiling access hatches upfront means your installation price stays firm after grant approval instead of triggering surprise variation invoices on handover day.
Why Zero-Deposit Terms Safeguard Grant Portal Filing
Because Enterprise Singapore rejects applications whenever a deposit or purchase order predates portal submission, standard retail payment schedules actively endanger SME claims. A grant-ready contractor structures quotation validity cleanly for 30 to 45 days with S$0 upfront commitment.
Snowflake Aircon Services charges S$30 for the commercial site survey (waived in full when you proceed with installation), delivers pre-approved model matching across Daikin, Mitsubishi Electric, and Panasonic, and collects zero equipment deposit until after your Business Grants Portal filing clears.
Steps to Prepare for Your Commercial Survey Appointment
Having basic premises details ready lets technicians complete your site inspection in under thirty minutes and issue an accurate portal-ready quotation within one to two working days:
- Share your registered company name, commercial site address, and current number of aircon zones on WhatsApp.
- Confirm keys or ladder access to false-ceiling panels, exterior condenser ledges, and the main electrical distribution board.
- Mention landlord or MCST permit rules, weekend work restrictions, and preferred off-peak installation days.
- Keep every deposit and signed purchase order on hold until you submit the final itemised quotation via Corppass.