When should a BTO aircon be installed?
During renovation, after any false ceiling or boxing that will hide the piping is framed, and before the final paint and touch-ups. That way the piping route is set once and the carpentry is built around it.
Report defects within 30 days of key collection before renovation starts, and get the renovation permit where your works need one.
| Extra | Market range in Singapore | Our rate |
|---|---|---|
| Outdoor unit bracket, standard to custom | $130–$380 per unit | $200 / unit |
| 20A isolator switch, the size HDB allows for aircon | $180–$500 per job | Quoted per job |
| Extra piping past the included length | $15–$120 per metre | |
| Concealing the piping in a false ceiling or boxing | Fewer than three operators price concealment the same way; the length and the carpentry set it. | Quoted per job |
| Second trip, if the site is not ready | $150 / trip |
Packages differ in the piping length they include per indoor unit. Snowflake's packages include up to 50 feet per indoor unit and exclude the bracket and the power point.
Market ranges: published rates from 3 Singapore operators; published rates from 4 Singapore operators; published rates from 5 Singapore operators. Checked 20 Nov 2026.
| Stage | What to do about the aircon |
|---|---|
| Before key collection | Decide the system, the indoor unit positions and whether piping will be concealed |
| Key collection, first 30 days | Report defects before renovation begins |
| Carpentry and false ceilings | Frame any boxing or ceiling that will hide the piping |
| Aircon installation | Run piping, fit units, vacuum and commission |
| Within 14 days after installation | Submit HDB's installation report |
| Final painting | Touch up around trunking and pipe holes |
HDB rules that shape a BTO installation
Newer blocks have the higher electrical loading, so no HDB permit is needed for the aircon's power points.
- The installer must be BCA-trained to install air-conditioning condensing units.
- Piping stays inside the flat and out of structural slabs, columns and beams.
- Condensate must drain to a floor trap inside the flat.
- Outdoor units go on the approved ledge, not along the common corridor.
- An installation report goes to the HDB branch within 14 days.
- Flats with the 40A loading take at most two split-type condensing units, at up to 110kg per wall panel.
Reading a package before you sign
Ask each installer for the piping length included per indoor unit, and whether the bracket, the power point and any concealment are extra. Those are the lines that most often move the final bill.
Snowflake's packages come in Mitsubishi Electric Starmex, its recommended brand, with Daikin also on the rate card.