On this page
Bare-shell removal vs keeping landlord ACMV systems
Commercial leases in Singapore rarely mirror residential handovers. Depending on whether you leased a bare retail shell, a fitted office with landlord chilled-water FCUs or an industrial unit with supplemental server-room splits, reinstatement duties can differ sharply.
Walk through the unit with building management at least sixty days before lease expiry to confirm exact written handover items.
| Equipment scenario | Typical lease-end obligation | Key compliance check |
|---|---|---|
| Tenant-installed splits, cassettes or server-room units | Pump down, dismantle & remove unless landlord signs written takeover | Proper NEA-compliant refrigerant recovery; cap wall penetrations & power |
| Landlord central chilled-water FCUs & flexible ducting | Reinstate altered diffuser positions back to base-building plan | Check Fire Code fire-damper integrity and balance airflow |
| Landlord-supplied standalone cassettes or splits | Final servicing, chemical wash if fouled & full functional test | Submit dated ACRA contractor service reports covering all units |
| Abandoned copper piping & floor-trap drains | Strip exposed trunking & seal wall openings neatly | Leaving cut pipes hanging breaches bare-shell handover sign-off |
Avoid costly last-week reinstatement surprises
Many departing commercial tenants assume a general demolition crew can yank out ceiling cassettes and server-room splits overnight. Unqualified demolition workers frequently vent refrigerant unlawfully, damage landlord chilled-water isolation valves or rip fire-rated ceiling barriers, leading building management to withhold large security-deposit sums for remedial ACMV work.
Have a qualified aircon contractor recover refrigerant cleanly, isolate circuits safely and remove equipment before general hacking starts.
Documentation required for smooth commercial deposit release
Compile one neat handover folder containing final aircon servicing invoices, condition reports confirming every retained landlord FCU cools cleanly without condensate leaks, electrical circuit termination records by a Licensed Electrical Worker if dedicated isolators were removed, and any written landlord waiver permitting incoming tenants to take over your aircons.
Complete physical ACMV checks a full week ahead of your final key-return walk-through so minor snagging resolves without holdover rent penalties.