Four functional checks before final sign-off
Visual neatness on painted trunking hides nothing once full Singapore humidity hits newly installed copper lines. During Trip 2 commissioning, insist on running every bedroom and living-room unit simultaneously on Cool at 22 degrees for at least thirty minutes while monitoring discharge flow, grille temperatures, and pipe surfaces.
For drainage verification, slowly pour clean water into each indoor drain tray and observe steady exit flow into the bathroom floor trap over twenty minutes. Sluggish trickle, bubbling backflow, or damp patches along boxed-up false ceilings point to flat pipe slope or crushed PVC bends behind carpentry.
| Handover test | Pass benchmark | Defect to rectify before payment |
|---|---|---|
| 20-minute drain pour test | Steady discharge to floor trap with zero wall dampness | Backflow, slow drip, or wet false-ceiling seam |
| Intake versus outlet temperature drop | Typically 8 to 12 degrees cooler at supply louvre | Weak drop under 6 degrees signalling gas or sizing issue |
| Insulation seam and trunking check | Dry, sealed Armaflex joints with tight casing covers | Sweating foam gaps, uninsulated flare unions, or loose lids |
| Outdoor bracket and ledge check | Level condenser, anti-vibration pads, clear exhaust throw | Rattling mount, kinked copper bend, or blocked front airflow |
Checking carpentry clearance and service access
Interior designers sometimes build pelmets or full-height wardrobes tightly around indoor units, leaving no room to unclip front grilles or slide out drain trays during future chemical washes. Confirm at least ten centimetres of top intake clearance and unobstructed panel swing on every bedroom FCU before signing off carpentry.
Inspect concealed ceiling cassettes or ducted condo units for properly sized access hatches positioned directly beneath motor compartments and condensate pumps. Missing access panels turn minor future drain clearing into messy ceiling cutting.
Paperwork and warranty registration at completion
Collect serial-number stickers, BCA-trained installer documentation for HDB flats, MCST approval records for condos, and workmanship warranty terms before settling the final milestone. Register manufacturer warranties online immediately while invoice dates remain fresh.