On this page
Quick summary
Claiming Singapore's business aircon grant takes six sequential stages inside the Business Grants Portal using your company Corppass account. Gathering an itemised zero-deposit quotation first, submitting before spending a dollar, and assembling clean post-install proofs ensures smooth disbursement.
Six Sequential Stages from Site Survey to Cash Payout
Every stage on the Business Grants Portal builds on the previous timestamp, so rushing ahead out of sequence risks losing funding. Business directors or authorised staff should assign Corppass access for Business Grants Portal early if the company has never filed a government grant before.
Most standard Base Tier aircon applications require straightforward corporate paperwork rather than lengthy engineering reports, making self-submission fast when your contractor supplies crisp documentation.
Scroll to see more columns
| Workflow stage | Owner action required | Key document needed | Strict rule to observe |
|---|---|---|---|
| 1. Site survey and quoting | Confirm room loads and pre-approved codes | Itemised hardware vs labour quote | Pay S$0 hardware deposit; sign no PO |
| 2. Online portal filing | Log into BGP via company Corppass | Quotation, ACRA profile, tenancy proof | Double-check exact condenser model code |
| 3. Application assessment | Respond quickly to officer clarifications | Updated specs or shareholding sheet | Wait for approval before big outlays |
| 4. Letter of Offer acceptance | Accept grant terms online within deadline | Signed digital Letter of Offer | Verify approved quantum and expiry date |
| 5. Installation and payment | Install exact units and settle invoice | Tax invoice, DO, bank transfer slip | Photograph installed units and serial plates |
| 6. Post-install claim payout | Upload proof pack on BGP for review | Photos, paid invoice, bank statement | Keep full records for audit inspection |
Documents to Ready Before Logging into the Grant Portal
Before starting your online draft, confirm your company administrator has assigned Business Grants Portal Preparer and Acceptor roles inside Corppass. Having two separate staff roles or a director with full acceptor rights avoids last-minute submission stalls.
Prepare recent PDFs of your ACRA BizFile showing at least 30% local equity, latest financial statements confirming SME revenue or headcount, your signed commercial tenancy agreement or title deed, and an itemised aircon quotation citing verified GoBusiness codes.
Installing After Submission Versus Waiting for Approval
Technically, Enterprise Singapore prohibits starting works prior to application submission, yet proceeding immediately after filing before receiving your official Letter of Offer still carries commercial risk if an assessor queries company eligibility or rejects an item.
Whenever existing units can limp through a few extra weeks with basic servicing, waiting for formal Letter of Offer approval guarantees exact co-funding certainty before issuing your purchase order and scheduling installation.
Checklist to Prepare Your Final Reimbursement Claim Pack
Clean post-installation documentation turns reimbursement into a routine administrative sign-off rather than weeks of back-and-forth emails. Collect these four items on installation completion day:
- Full final tax invoice dividing qualifying hardware from copper pipework, fitting works, haulage, and 9% tax.
- Signed delivery order listing the exact outdoor condenser and indoor fan coil serial numbers delivered to your commercial site.
- Corporate bank transfer receipt and matching bank statement line proving full payment from your applicant company account.
- High-resolution photos showing your exterior signboard, installed fan coils, mounted condensers, and close-up serial rating plates.