Repair, reroute or replace a concealed leak?
Repair the hidden section when the leak is in one place and the finish can be opened and patched. Reroute in exposed trunking when the run is long, the leak is hard to reach, or the finish is costly to open.
Scroll to see more columns
| Option | Market range in Singapore | Our rate | What it involves |
|---|---|---|---|
| Leak test to place the leak | $50–$180 per job | Quoted per job | Pressure test and leak search along the run |
| Open the finish and replace the hidden section | $150–$500 per job | Quoted per job | Wall or ceiling opened at the leak, section replaced, finish patched |
| Abandon the hidden run and reroute in exposed trunking | Fewer than three operators publish a reroute price; the new route's length sets it. | Quoted per job | New pipe run outside the wall in trunking; old run left in place |
The patch price covers a small opening; a longer hidden section, tiles or a feature wall cost more to open and make good. Every option ends with a vacuum and a recharge by weight.
Market ranges: published rates from 4 Singapore operators; published rates from 3 Singapore operators. Checked between 18 Nov 2026 and 20 Nov 2026.
Why the leak test comes first
A concealed run cannot be inspected by eye. The leak test narrows the leak to a section before anything is opened, so only that part of the wall or ceiling comes apart.
If the test points to a joint at the indoor or outdoor unit rather than the hidden run, no wall needs opening at all.
What decides between the options
HDB keeps aircon pipes out of reinforced concrete, so concealed runs in flats sit in boxing, false ceilings or trunking.
- Where the leak is: one point, or several along the run.
- What hides the pipe: plaster, a false ceiling, tiles or a feature wall.
- Whether exposed trunking is acceptable in that room.
- Whether the room is being renovated anyway.
Avoiding a repeat
A concealed run that leaked once may leak again elsewhere along its length. If a second leak appears, rerouting or replacing the whole run is usually cheaper than opening the finish again.