Can an older HDB flat take a new aircon?
Usually, yes. HDB blocks completed on or after 1 January 1994, and blocks that have been through the Main Upgrading Programme or the Home Improvement Programme, have the higher electrical loading of a 40A main switch.
Those flats need no HDB permit for new aircon points. Flats without the higher loading need an HDB electrical permit for a new 15A point or 20A isolator, and have limits on the aircon they can run.
| Electrical job | Market range in Singapore | Our rate |
|---|---|---|
| New 15A aircon power point from the board | $250–$350 per job | Quoted per job |
| 20A isolator switch, the size HDB allows for aircon | $180–$500 per job | Quoted per job |
| Distribution board replaced or upgraded | $280–$900 per job | |
| Full rewiring, 3-room or 4-room flat | $2,000–$6,000 per job |
New wiring in an HDB flat runs in trunking or above a false ceiling; HDB bars embedding it in concrete or plaster. A board upgrade varies with the number of circuits.
Market ranges: published rates from 3 Singapore operators; published rates from 4 Singapore operators. Checked 20 Nov 2026.
Check which kind of flat you have
The main switch at the distribution board shows the rating. If in doubt, a licensed electrical worker can confirm it.
| Your flat | What HDB allows | What to do |
|---|---|---|
| Block from 1994 or later, or upgraded under MUP or HIP | Higher loading, 40A main switch; no permit for new aircon points; at most two split-type condensing units | Book the installation; a licensed electrical worker handles any new point |
| Older block, not upgraded, using an existing approved point | No permit needed for the existing 15A point or 20A isolator | Check the total running current stays within HDB's limit |
| Older block, not upgraded, needing a new point | HDB electrical permit needed first | Apply for the permit before the installation |
Limits on flats without the higher loading
HDB caps the total running current of the aircon in these flats: 8.5A for 3-room, 4-room and 5-room flats, executive maisonettes and multi-generation flats, and 5A for 1-room and 2-room flats. A system above the cap needs a smaller system or a change in the flat's loading, which a licensed electrical worker advises on.
Compare the new outdoor unit's rated running current with the cap before buying.
Who does the electrical work
Only a licensed electrical worker may do the electrical work. New wiring is tested before it is switched on, and HDB requires an endorsed SP Services form for testing new wiring in a flat.
Snowflake Aircon Services prices electrical work separately, and licensed electricians handle it where it is required.