On this page
Quick summary
Singapore SMEs can claim up to 70% of pre-approved aircon hardware costs under the Energy Efficiency Grant Base Tier. Non-SME firms receive up to 30%, capped at S$30,000 per firm each year. The grant pays for hardware only, and you must file before signing a PO or paying a deposit.
Checking SME Eligibility and the S$30,000 Base Tier Cap
The Energy Efficiency Grant Base Tier helps local firms swap old aircons for efficient sets. Singapore SMEs with annual sales up to S$100 million, or up to 200 staff, get up to 70% hardware support.
Larger local firms outside SME limits still receive up to 30% support. Both groups share a Base Tier cap of S$30,000 per firm each year. Your company needs at least 30% local equity and a commercial, retail, or factory site in Singapore.
Every quoted indoor and outdoor model must sit on the live pre-approved list on the day you apply. Single-split sets need an NEA 5-tick badge. Multi-split and VRF sets must also meet listed tick and low-GWP rules.
Separating Grant-Funded Hardware from Excluded Labour Costs
Grant payouts cover qualifying aircon hardware listed on your quote and tax invoice. Labour, copper pipes, removal of old sets, and GST stay outside the grant. Your firm pays those costs on its own.
See how standard project lines split between funded hardware and excluded site work.
Scroll to see more columns
| Quotation line item | EEG Base Tier treatment | SME funding share | What to check on your quote |
|---|---|---|---|
| Pre-approved condenser and fan coils | Eligible hardware cost | Up to 70% (30% non-SME) | Exact model codes must match official repository |
| Standard remote controllers included with set | Eligible when bundled in model SKU | Up to 70% (30% non-SME) | Confirm listed under hardware line, not accessory |
| Installation labour and copper piping | Excluded from grant payout | 0% (paid by tenant or owner) | Must appear as a separate non-hardware line |
| Dismantling, disposal, and scaffold hire | Excluded from grant payout | 0% (paid by tenant or owner) | Itemise clearly so assessors approve hardware fast |
| 9% GST on total project invoice | Excluded from grant payout | 0% (claim via GST filing if registered) | Verify net hardware subtotal before tax |
Avoiding the Deposit and Purchase Order Rejection Trap
One rushed step voids your whole claim with no appeal. Never sign a PO, book stock with a deposit, or strip old units before you submit on the Business Grants Portal.
Start with a simple site survey instead. Snowflake Aircon Services charges S$30 for a Singapore survey and waives that fee when you install. We issue a zero-deposit quote that splits eligible hardware from pipes and labour.
Log into the Business Grants Portal with Corppass and upload that clean quote. Wait for the formal Letter of Offer before ordering hardware. Keep delivery orders, bank slips, and model-plate photos ready for your claim.
Checklist Before Submitting on the Business Grants Portal
Missing one file or mixing labour into unit prices slows review by weeks. Run these four checks before clicking submit:
- Download a fresh ACRA profile showing at least 30% local equity and your business site address.
- Match each outdoor and indoor model code against the live pre-approved list on filing day.
- Check that your quote splits hardware prices cleanly from pipes, removal, disposal, and GST.
- Confirm no PO is signed and no hardware deposit is paid before portal submission.