GoBusiness Energy Efficiency Grant thresholds separate single-phase multi-splits from three-phase VRF systems sharply. Pre-approved multi-splits require 5 green ticks plus weighted COP of 5.8 or higher, whereas listed VRF condensers qualify from 3 ticks while spreading heavier cooling loads across three electrical phases.
Wall-mounted general servicing $25–$50/unit · chemical wash $60–$80/unit · View servicing rates
Verify SME EEG COP and Tick Thresholds for Both Systems
Under GoBusiness EEG rules, equipment eligibility depends heavily on condenser architecture. Multi-split systems must achieve 5 green ticks AND at least 5.8 weighted COP, disqualifying common 5.5 to 5.7 COP residential sets from commercial co-funding.
Pre-approved VRF sets enjoy a lower 3-tick minimum bar under EEG, opening doors for clinics, tuition centres, and retail outlets needing five or more ceiling cassettes or ducted fan coils.
Compare Single-Phase Multi-Splits Against 3-Phase VRF Rules
Review grant gates, electrical supply fit, and piping flexibility across both commercial options:
Scroll to see more columns
| Selection factor | Single-phase multi-split | 3-phase light VRF | SME engineering note |
|---|---|---|---|
| EEG tick & COP floor | 5 ticks and >= 5.8 COP | Minimum 3 ticks | Must appear on GoBusiness list |
| Incoming power supply | Single-phase isolator (60A/63A DB) | Three-phase 400V isolator | Phase upgrade needs EMA LEW |
| Pipe length & zoning | 2 to 4 nearby rooms | 5+ zones, long runs | VRF suits deep shophouse units |
| Snowflake survey rate | S$30 on-site check | S$80 VRV/VRF check | Both waived upon repair or install |
Assess Distribution Boards, Pipe Lengths, and Shophouse Constraints
Older Singapore shophouse units and small offices frequently arrive with single-phase supply only. Upgrading to three-phase power requires SP Group meter review plus sign-off from a qualified LEW registered with EMA, pushing fit-out timelines out.
Conversely, deep offices exceeding single-phase multi-split piping limits benefit immediately from three-phase VRF distribution, balancing compressor current cleanly across three live phases without nuisance tripping.
Book an EEG Site Survey and Commercial Servicing Schedule
Hold purchase orders until GoBusiness clears your application, and lock preventative servicing into annual operating budgets:
- Select a S$30 multi-split check or S$80 VRV/VRF assessment; survey fees waive in full once work starts (30-day repair cover applies).
- Confirm incoming DB phase capacity with an EMA-registered electrician before shortlisting three-phase outdoor condensers.
- Keep ceiling cassettes and wall units clear through quarterly general servicing: S$25 per zone across three-plus outlets, S$30 per zone for pairs, and S$50 for one cassette (14-day workmanship guarantee).
- Prevent blocked drains via chemical washes (S$80 single, S$70 per pair unit, S$60 each on three-plus units; 60-day cover) or annual overhauls (S$150 single, S$125 paired, S$115 for 3+ units; 90-day cover).
Common Questions
Why do many 5-tick multi-splits fail Singapore SME EEG approval?
Can an SME install a 3-phase VRF condenser in a single-phase shophouse?
Why does a VRV or VRF survey cost S$80 instead of S$30?
Are piping and electrical DB upgrade works covered under SME EEG grants?